8–12 Week Fixed-Scope Engineering Programs

Reliability & Asset Integrity Engineering Services

RAMIS Consulting executes fixed-scope engineering engagements for mining, offshore oil and gas, and electric power operators in Ghana and West Africa. Every engagement delivers native ReliaSoft models and load-ready SAP PM or IBM Maximo task lists.

Reliability, Availability, & Maintainability (RAM) Modeling

Parametric Weibull life data analysis and Monte Carlo Reliability Block Diagram (RBD) simulation to isolate capacity bottlenecks and size critical spares buffers across 6-to-16-week maritime lead times.

Standard Duration:8–12 weeks (1–2 process circuits or HME fleets)
Core Deliverables:Native ReliaSoft Weibull++ & BlockSim models, B10 life tables, and Tema port critical spares min/max upload sheets
  • 2- and 3-parameter Weibull life data analysis (β, η, B10 life) in ReliaSoft Weibull++ using right-censored CMMS histories
  • Series-parallel Reliability Block Diagrams (RBD) and Monte Carlo availability simulation in ReliaSoft BlockSim
  • Crow-AMSAA Non-Homogeneous Poisson Process (MIL-HDBK-189C) reliability growth tracking across HME and rotating fleets
  • Critical spares min/max and reorder-point optimization calibrated to 6-to-16-week Tema and Takoradi port transit times
  • Life Cycle Costing (LCC) and capital redundancy trade-off studies for crushers, SAG/ball mills, and pumping stations
RELIABILITY BLOCK DIAGRAM (RBD) MODELCrusher AR=0.992Slurry Pump B1R=0.950Slurry Pump B2R=0.950Ball Mill CR=0.985SYSTEM AVAILABILITY: A_sys = MTBF / (MTBF + MTTR) | R_sys = 0.974

Reliability-Centered Maintenance (RCM-II) & RBI

Facilitated SAE JA1011/1012 RCM-II decision analysis and API 580/581 Risk-Based Inspection engineering to replace calendar guesswork with failure-mode-specific maintenance tasks.

Standard Duration:8–12 weeks per critical asset class
Core Deliverables:SAE JA1011 FMECA registers, API 580/581 RBI inspection plans, and load-ready SAP PM / Maximo task lists
  • Failure Modes, Effects, and Criticality Analysis (FMECA) compliant with SAE JA1011 and SAE JA1012 criteria
  • PM task rationalization eliminating intrusive calendar teardowns on β ≤ 1 failure modes
  • Quantitative Risk-Based Inspection (RBI) per API 580/581 and Fitness-For-Service (API 579-1) for Gulf of Guinea FPSOs and tank farms
  • Structured Root Cause Analysis (RCA) and fault-tree investigations for repeat comminution, turbine, and mobile fleet failures
RCM DECISION LOGIC TREE (SAE JA1011)Is failure evidentto operators?NO (Hidden)YES (Evident)Run Hidden FailureFinding TaskSafety or EnviroConsequences?YESMandatory PM/PdMOr Redesign AssetPM Tasks

Predictive Maintenance (PdM) & Condition Monitoring Architecture

Vendor-neutral engineering of vibration, thermography, and tribology monitoring routes calibrated to capture incipient defects across the P-F interval before catastrophic shaft or bearing seizure.

Standard Duration:8–12 weeks (diagnostic baseline & P-F interval setup)
Core Deliverables:ISO 10816/20816 alarm/trip matrices, route definitions, and CMMS trigger-to-work-order workflows
  • Vibration FFT severity baselines and alarm/trip thresholds (ISO 10816 / ISO 20816) for SAG/ball mill drives, crushers, and gas turbines
  • Infrared thermography inspection protocols for 161kV/33kV/11kV switchgear, transformers, and motor control centers
  • ISO 4406 lube oil cleanliness and wear-debris tribology standards for high-dust Tarkwa and Obuasi operating environments
  • Automated PdM exception-to-work-order escalation rules inside SAP PM and IBM Maximo
FFT VIBRATION FREQUENCY SPECTRUM (ISO 10816)Velocity (mm/s)Frequency (Hz · 50Hz Fundamental)UNSATISFACTORY LIMITALERT LIMITGear Mesh 1xRunning 1x

CMMS / EAM Data Hygiene & ISO 14224 Standardization

Restructuring and cleansing SAP PM and IBM Maximo asset registers so historical work orders support Weibull life data analysis and auditable spares forecasting.

Standard Duration:8–12 weeks (12–36 months work-order cleansing & taxonomy build)
Core Deliverables:ISO 14224 functional location hierarchy, failure code catalogs, and bulk CMMS upload spreadsheets
  • Asset hierarchy reconstruction and parent-child functional location mapping compliant with ISO 14224
  • Standardized 3-tier failure mode, mechanism, and cause code catalogs replacing free-text work-order closure notes
  • Bill of Materials (BOM) linkage and critical spares cross-referencing across rotating and structural assemblies
  • Load-ready SAP PM and IBM Maximo upload sheets with validation rules to enforce technician data entry compliance
ASSET TAXONOMY HIERARCHY (ISO 14224)Level 1: Industry (Mining / O&G)Level 2: Plant/Unit (Comminution)Equipment: Ball Mill 01Equipment: Jaw Crusher 02SAP PM / Maximo: [FD-Mechanical] -> [FM-Fatigue] -> [FT-Crack]

RAM Mastery Practitioner Training (3-Day On-Site Cohort)

Three-day technical practitioner training for maintenance engineers, planners, and operations supervisors conducted on-site in Ghana or via structured virtual cohorts.

Standard Duration:3 days intensive workshop (capped at 20 engineers per cohort)
Core Deliverables:Worked ReliaSoft Weibull++ & RCM-II templates using your site's de-identified CMMS data, plus 2.4 CEU / 24 PDH certificates
  • Weibull life data fitting (β, η, B10) and Crow-AMSAA (MIL-HDBK-189C) reliability growth calculations on real mine and plant datasets
  • Hands-on SAE JA1011 RCM-II and FMECA facilitation workshops on site bad-actor equipment
  • ISO 14224 work-order coding governance and SAP PM / Maximo KPI dashboard construction (MTBF, MTTR, OEE)
  • Life Cycle Costing (LCC) and spares holding cost arithmetic for 6-to-16-week West African port lead times
RELIABILITY BLOCK DIAGRAM (RBD) MODELCrusher AR=0.992Slurry Pump B1R=0.950Slurry Pump B2R=0.950Ball Mill CR=0.985SYSTEM AVAILABILITY: A_sys = MTBF / (MTBF + MTTR) | R_sys = 0.974

Electric Power Generation Asset Risk Management

Probabilistic outage risk quantification and reliability-centered maintenance for thermal generating stations (VRA Aboadze, Kpone, Sunon Asogli), hydro plants (Akosombo, Bui), and mine captive power islands.

Standard Duration:8–12 weeks (generating block or captive power plant)
Core Deliverables:IEEE 493 risk models, turbine/generator FMECA, ReliaSoft RBD files, and SAP PM / Maximo outage task lists
  • Probabilistic generation reliability and forced-outage risk modeling per IEEE 493 (Gold Book) and MIL-HDBK-189C
  • Gas and steam turbine, HRSG, excitation, and step-up transformer failure mode and criticality modeling
  • Evaluation of 50Hz grid frequency excursion and load-shedding thermal cycling stress on generating unit bearings and windings
  • Quantified CAPEX and overhaul deferral risk justification aligned with Energy Commission and PURC availability mandates
IEEE 493 GENERATION ASSET RISK MODEL (50Hz)Failure ModesPoF × CoF MatrixCAPEX / PM ActionAboadze · Kpone · Sunon Asogli · Mine Captive Power Islands

Electric Power Distribution & Network Reliability

Substation configuration, protection scheme, and feeder contingency modeling for transmission and distribution operators (GRIDCo, ECG, NEDCo) and high-voltage industrial power networks.

Standard Duration:8–12 weeks (substation bus & feeder corridor study)
Core Deliverables:IEEE 1366 SAIDI/SAIFI/CAIDI models, IEC 61850 protection reliability audit, and substation CMMS upload sheets
  • Feeder and network interruption index modeling (SAIDI, SAIFI, CAIDI, MAIFI) per IEEE 1366 across 161kV, 33kV, and 11kV corridors
  • Substation busbar topology, N-1 transformer redundancy, and breaker failure probability analysis
  • IEC 61850 substation automation and protective relay hidden-failure finding interval optimization per SAE JA1011
  • Quantitative ranking of feeder sectionalizing, recloser placement, and coastal salt-fog insulator maintenance options
IEEE 1366 & IEC 61850 NETWORK RELIABILITY MODEL161kV GRIDCo Bus33/11kV SubstationFeeder SAIDI/SAIFIVRA · GRIDCo · ECG · NEDCo · N-1 Contingency & Protection
On-Site & Cohort Technical Training

3-Day Practitioner Workshop: Weibull++, RCM-II & ISO 14224

Your site engineers and maintenance planners work directly on de-identified SAP PM or IBM Maximo work-order exports to build Weibull life models and SAE JA1011 task lists.

3-Day Technical Practitioner Course · 2.4 CEU / 24 PDH

RAM MASTERY

Applied Weibull life data analysis, SAE JA1011 RCM-II facilitation, Crow-AMSAA growth modeling, and ISO 14224 CMMS governance for West African maintenance engineers and planners.

$60K–$120K/hr
Tier-1 Comminution Stoppage
6–16 wk
Tema Port Critical Spares Lead Time
20 Engineers Max
On-Site or Virtual Cohort Size
Calendar Maintenance Without Weibull Failure Physics Wastes Budget and Uptime
SAG/Ball Mill Stoppage: $60K–$120K/hr · CAT 785/793 Haul Truck Outage: $3.5K–$6.5K/hr · Maritime Spares Transit via Tema & Takoradi Ports: 6–16 Weeks
Worked Case Datasets

West African Field Scenarios Analyzed in Class

Participants execute Weibull parameter estimation, FMECA criticality scoring, and spares reorder calculations on four regional failure modes:

Mining & Comminution
SAG & Ball Mill Pinion Bearing Seizure
Unplanned comminution stoppage costs $60K–$120K/hr in deferred gold production, plus 3x–5x air-freight charter premiums when 6–16 wk Tema port spares run out.
Heavy Mobile Equipment (HME)
CAT 785/793 Final Drive & Strut Wear-Out
Haul truck downtime costs $3.5K–$6.5K/hr in lost material movement. Calendar PM overhauls miss early abrasive dust ingress and waste serviceable components.
Offshore Oil & Gas
Gulf of Guinea FPSO Gas Compressor Trip
Process train trips trigger production deferral, flaring limits, and Petroleum Commission / EPA Ghana audit interventions when API 580/581 RBI intervals drift.
Thermal & Hydro Power
50Hz Grid Excursion & Step-Up Transformer Fault
Unplanned unit trips and 161kV/33kV substation insulation failures force emergency liquid-fuel dispatch and breach Energy Commission and PURC availability targets.

Single-Stoppage Payback Arithmetic

$2,500
Per Engineer (Or Fixed Site Cohort Rate)
1 Hour
Avoided Comminution or Process Outage
$60K–$120K/hr
Deferred Production Preserved
Six Technical Modules

3-Day Engineering Syllabus

Every module includes worked ReliaSoft Weibull++ / RGA templates and ISO 14224 CMMS upload sheets.

MOD 01
Weibull Life Data & Crow-AMSAA Analysis
Fit 2- and 3-parameter Weibull distributions (β, η, B10 life) to right-censored CMMS failure logs and track fleet reliability growth per MIL-HDBK-189C.
MOD 02
System Availability & Spares Optimization
Build series-parallel Reliability Block Diagrams (RBD) and calculate min/max critical spares reorder levels around 6–16 week Tema and Takoradi port lead times.
MOD 03
SAE JA1011 RCM-II & FMECA Execution
Facilitate structured Failure Modes, Effects, and Criticality Analysis (FMECA) and assign evident vs. hidden failure-finding, PdM, or hard-time restoration tasks.
MOD 04
Life Cycle Costing (LCC) & Repair-vs-Replace
Quantify Total Cost of Ownership (TCO), repair-versus-replace thresholds for HME and rotating assets, and capital redundancy payback periods.
MOD 05
ISO 14224 CMMS Taxonomy & KPI Engineering
Structure SAP PM and IBM Maximo asset hierarchies, enforce 3-tier failure mode coding, and track leading vs. lagging indicators (MTBF, MTTR, schedule compliance).
MOD 06
Root Cause Failure Analysis (RCFA) & Fault Trees
Conduct evidence-based fault-tree and physical root-cause investigations for chronic bearing, gearset, seal, and switchgear trips with verifiable CAPA sign-off.

Delivery Specifications

Format & Duration
3 Days (24 Hours)
80% quantitative problem sets using site work-order exports; 2.4 CEUs / 24 PDHs issued
Cohort Cap
20 Engineers Max
On-site delivery at mine/plant training centers in Ghana or live virtual instruction
Standards Alignment
SMRP · SAE · ISO
Curriculum aligned with SMRP Body of Knowledge, SAE JA1011, and ISO 14224

Target Engineering Roles

Reliability & Maintenance EngineersExecute Weibull life data fits, Crow-AMSAA growth tracking, and SAE JA1011 FMECA studies on bad-actor assets.
Maintenance Planners & CMMS AdministratorsRestructure SAP PM and IBM Maximo hierarchies per ISO 14224 and build defensible PM task intervals.
Plant & Asset Integrity ManagersJustify capital replacement, critical spares buffers, and turnaround scope using quantitative risk models.
Condition Monitoring & Field SupervisorsCalibrate ISO 10816 vibration, thermography, and tribology routes to component P-F intervals.

Schedule an On-Site Cohort for Your Maintenance Team

We customize the 3-day workshop problem sets around your site's SAP PM or IBM Maximo asset register and bad-actor failure history.

Cohort Capacity Capped at 20 Engineers Max · Available On-Site in Ghana & West Africa
© 2026 RAMIS Consulting (A subsidiary of JE3 GBADAM LLC) · Curriculum aligned with SMRP Body of Knowledge, SAE JA1011, and ISO 14224
SAE JA1011 / JA1012ISO 14224SMRP BoK Aligned
Direct Engineering Scoping

Scope an 8-to-12-Week Engagement on Your Bad-Actor Assets

Share a 12-month work-order export from SAP PM or IBM Maximo for one critical circuit, fleet, or substation corridor. We will review your failure coding quality and define a fixed-price statement of work on a 30-minute call.

Book a 30-Minute Scoping Call